Toggle mobile menu visibility

Sustainable Drainage Approval Body (SAB)

From January 7th 2019, all new developments of more than 1 house or where the construction area is of 100m2 or more will require sustainable drainage to manage on-site surface water. Surface water drainage systems must be designed and built in accordance with mandatory standards for sustainable drainage published by Welsh Ministers.

These systems must be approved by the local authority acting in its SuDS Approving Body (SAB) role before construction work begins.  The SAB will have a duty to adopt compliant systems so long as it is built and functions in accordance with the approved proposals, including any SAB conditions of approval.

Share this page

Facebook icon Twitter icon Email icon

Print

Print icon